1 /* Copyright 2002-2025 CS GROUP
2 * Licensed to CS GROUP (CS) under one or more
3 * contributor license agreements. See the NOTICE file distributed with
4 * this work for additional information regarding copyright ownership.
5 * CS licenses this file to You under the Apache License, Version 2.0
6 * (the "License"); you may not use this file except in compliance with
7 * the License. You may obtain a copy of the License at
8 *
9 * http://www.apache.org/licenses/LICENSE-2.0
10 *
11 * Unless required by applicable law or agreed to in writing, software
12 * distributed under the License is distributed on an "AS IS" BASIS,
13 * WITHOUT WARRANTIES OR CONDITIONS OF ANY KIND, either express or implied.
14 * See the License for the specific language governing permissions and
15 * limitations under the License.
16 */
17 package org.orekit.time;
18
19 import java.util.List;
20
21 /** Interface for selecting dates within an interval.
22 * <p>
23 * This interface is mainly useful for {@link
24 * org.orekit.estimation.measurements.generation.AbstractScheduler scheduling}
25 * measurements {@link org.orekit.estimation.measurements.generation.Generator
26 * generation}.
27 * </p>
28 * @see org.orekit.estimation.measurements.generation.AbstractScheduler AbstractScheduler
29 * @see org.orekit.estimation.measurements.generation.Generator Generator
30 * @author Luc Maisonobe
31 * @since 9.3
32 */
33 public interface DatesSelector {
34
35 /** Select dates within an interval.
36 * <p>
37 * The {@code start} and {@code end} date may be either in direct or reverse
38 * chronological order. The list is produced in the same order as {@code start}
39 * and {@code end}, i.e. direct chronological order if {@code start} is earlier
40 * than {@code end} or reverse chronological order if {@code start} is later
41 * than {@code end}.
42 * </p>
43 * <p>
44 * The ordering (direct or reverse chronological order) should not be changed
45 * between calls, otherwise unpredictable results may occur.
46 * </p>
47 * @param start interval start
48 * @param end interval end
49 * @return selected dates within this interval
50 */
51 List<AbsoluteDate> selectDates(AbsoluteDate start, AbsoluteDate end);
52
53 }